The Challenge:
A growing chemical manufacturing company in Dubai needed to upgrade their steam production capacity. Their existing boiler was undersized for their new production line, causing steam pressure drops and production delays. They required a larger, more reliable boiler that could run on both natural gas and diesel, meet strict UAE safety and environmental standards, and be installed with minimal disruption to their ongoing operations.

Project Location: Dubai, United Arab Emirates
Industry Application: Chemical manufacturing (detergent and cleaning product production)
Equipment Supplied: 4 ton per hour oil & gas fired steam boiler (dual fuel)
4 ton/hour steam capacity – meeting increased production demand
Dual fuel operation – seamless switching between natural gas and diesel
High thermal efficiency (93-96%) – lowering fuel consumption and costs
PLC automatic control system – touchscreen interface with real-time monitoring
CE certified – fully compliant with UAE import regulations
Corrosion-resistant design – suitable for chemical industry applications
Capacity assessment – calculated required steam output based on their new production line
Factory selection – chose a certified manufacturer with Gulf region export history
Quality inspection – performed pre-shipment testing including pressure and leak tests
Logistics coordination – arranged sea freight from China to Jebel Ali Port
Installation supervision – coordinated with local contractors for smooth setup
Commissioning support – provided remote and on-site guidance for startup